Bathroom Addition Rough-In & Finish
Full plumbing scope for a new bathroom: wet-wall framing coordination, slab cut or joist penetration, drain field and vent stack tie-in, supply rough-in, and finish with the fixture package of your choice. We pull the permit and schedule inspections to keep your GC on timeline.
What's included
- Drain rough-in: toilet, tub/shower, vanity
- Vent stack extension and tie-in
- Hot/cold supply rough-in with shutoffs
- Finish plumbing: toilet, tub, vanity, shower valve
- Permit and inspection scheduling
A bathroom addition requires cutting a slab or penetrating floor joists, extending vent stacks, and integrating with the home's existing drain-waste-vent system — it's scope most handymen can't legally perform.
Schedule online, skip the wait.
Real-time booking — choose your window and we show up on time. Emergency slots available around the clock.
- 24/7 online booking — no phone needed
- On-time arrival or we call ahead
- Licensed plumbers · Jacksonville FL
Whole-House Repipe
Full PEX-A or copper supply-line replacement
Slab Leak Detection & Repair
Electronic detection, pressure test, and repair or reroute
Main Sewer Line Replacement
Trenchless pipe bursting, CIPP lining, or open-cut replacement